Portal de Torre Pacheco

www.portaldetorrepacheco.com

Torre Pacheco - SpanishTorre Pacheco - English
detail of Torre Pacheco

 

[Next-TorrePacheco (15/12/2020)

| Five important projects, with an investment of 21 million euros, have been presented by the Torre Pacheco city council to the European Covid recovery fund | The Torre Pacheco city council has presented five projects that can be financed by the EU Covid Recovery Fund, the amount of which amounts to 21 million euros. These projects, which have been presented to the Autonomous Community, through the NextCARM initiative, to participate in the Next Generation European Union Recovery Fund, endowed with 750,000 million euros (140,000 million for Spain) have been presented by the mayor of Torre Pacheco Antonio Le n and the councilor for Finance and European Projects Carlos L pez. The Mayor has declared that "the projects respond to the needs of the Municipality of Torre Pacheco, they are ambitious but realistic." The proposals presented have been: -Sciencelabkids, is a research center and educational innovation that studies environmental, emotional and motivational factors that influence self-regulation and behavior of the child. The Mayor has stated that this center is "the first of its kind conceived in Spain for the study and application of neuroscience in the field of learning". -Rambla Sur Project A comprehensive action project is proposed, made up of several operations, which redefines the urban section of Rambla Sur in Torre Pacheco.

In this way, it will reduce the urban vulnerability of this space, thus solving one of the main problems of the urban area of ??Torre Pacheco in the event of torrential rains.

This project will introduce solutions that improve resilience to climate change, such as the introduction of Sustainable Urban Drainage Systems (SUDS), as well as filtering soils that reduce runoff.

superficial. In addition, this action would serve to sustainably structure the urban area, optimizing the use of water resources and seeking the preservation of the natural environment. - Centro C vico de Rold n. A comprehensive rehabilitation of the Civic Center of Rold n will be carried out, in search of increasing its energy efficiency and improving the spaces. It is considered essential to carry out a comprehensive rehabilitation of this building that enables its use, optimizing the efficient consumption of the council's resources. Within the proposed rehabilitation, actions will be carried out to improve both the thermal envelope of the building and the systems (lighting, air conditioning, etc.).

In addition, the interior spaces will also be renovated and adapted to adapt them to the requirements demanded by the Rold n society. - Modernization Plan of the public lighting of the Municipality. The modernization of the entire public lighting infrastructure of Torre Pacheco is intended, through the installation of LED technology and remote management systems for lighting. Currently, the Torre-Pacheco City Council has a total of 241 public lighting panels and 17,400 light points.

The electricity consumption in public lighting, (last 12 months), has been of 6,253 .599 kWh, corresponding to 537.81 toe / year and emissions of 3,258.13 tons of CO2 / year. That is why it is essential to act on these services by modernizing them with the best technologies available on the market, with the aim of transforming them into a modern, intelligent and efficient infrastructure. -Plan to improve Urban Mobility of the Municipality. Improvement of the mobility of the old town of Torre Pacheco through the construction of a roundabout, and of Balsicas with an action to improve Avda.

De la ciudad de Murcia and Avda. The main action of this project is to improve a part of the road infrastructure following the philosophy set by the existing Sustainable Urban Mobility Plan.

This will be carried out with the main objective of continuing with the change of the municipality's transport model towards achieving sustainable transport and mobility, particularly in congested areas. In the common reconstruction effort and aligned with the 2030 Agenda, these projects are presented, which, in statements by the Councilor for Finance and European Projects, Carlos L pez "are adapted to the characteristics and existing challenges in our town, from the knowledge close to the needs of the citizens, and, in response to the fundamental role that municipalities have played in responding to the crisis caused by Civd-19 " y whose objective, according to López, is to achieve a municipality whose goals and principles are adapted "to the Sustainable Development Goals to achieve a more just, resilient and sustainable municipality." function { ;(, , {});}

Source: Ayuntamiento de Torre Pacheco

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información