Portal de Torre Pacheco

www.portaldetorrepacheco.com

Torre Pacheco - SpanishTorre Pacheco - English
detail of Torre Pacheco

 

Work on Station Avenue will improve the firm in one of the main arteries of Torre Pacheco (24/04/2011)

The project includes resurfacing and signage along the 1.2 km

The works carried out on Avenue Station Torre Pacheco provide a traffic safer by strengthening firm one of the main thoroughfares of the town, this road is traveled by more than 2.7 million drivers year, according to Monday's director of Roads, Jose Guijarro.

This action takes place in the urban section of the MR-F14, which connects the town to the motorway to Murcia and Cartagena (A-30), which also will perform works of replacing the drainage system, both stormwater as sanitation, which are nearing completion.

Similarly, the project includes renovation of the pavement on the avenue, over 1.2 kilometers, and the placement of proper signage, "which will increase the comfort and road safety for residents town and the tourists who annually come to town, "said the director general.

Moreover, from the railway station to the street Argentina, have a stretch of collector and street crossings Villa Brazil, Bolivia and Argentina have installed storm grates to ensure proper road conditions in the case of rains This has been complemented with two separate sections of collector streets between Argentina and Juan Ramón Jiménez, and between Benavente Jacinto Street and Main Street.

Source: CARM

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información