Portal de Torre Pacheco

www.portaldetorrepacheco.com

Torre Pacheco - SpanishTorre Pacheco - English
detail of Torre Pacheco

 

Development will allocate more than half a million euros to repair the road from Torre Pacheco to Pozo Estrecho (26/10/2015)

The Minister of Public Works and Infrastructures, Francisco Barnabas, today announced the president of the Business Confederation COEC Torre Pacheco, Innocent Canovas, the repair project of the firm RM-F51 road, which goes from Torre Pacheco to Cartagena deputation of Pozo Estrecho and which will have a budget of 511,000 euros and a lead time of four months.

During a meeting held at the Palacio de Aguirre, Minister Canovas told the details of this project, which is in the final stage of the bidding process and that "the works expected to commence later this year."

This is a performance demanded by the pachequera business organization, which is collected as part of a series of demands for improved communications in various Campo de Cartagena.

Bernabe said that "this road generates a daily average traffic of 3,000 vehicles for its strategic location", which gives access to the trade fair of the town (IFEPA) crosses over the railway Murcia-Cartagena and the promenade and reaches Albujón to Pozo Estrecho, where it joins the RM-311 (Albujón-The Blessed).

Also, the Minister of Development said that this regional road "accumulates a large heavy vehicles to be an especially agricultural area, which inevitably affects the firm, located in a damaged and deformed state and an irregular surface."

Francisco Bernabé said that with this intervention, "the quality of communication and, above all, road safety of drivers on this route will increase."

So, we will act on a plot of 3.7 kilometers, between 1,265 and 5,030 points, sanitizing work for the firm in the areas of torches, the extension of a base coat to regularize the grade of the road and strengthening the firm.

It will also act on the compacted artificial gravel berms, ditches will be covered with concrete and the grade of the road will be modified to facilitate the evacuation of river water.

Also, cleaning and placing the signs and markings they will be made.

Road improvements in Balsicas

The Minister also emphasized the repair and improvement of the firm are being undertaken in the RM-F22 road that connects the town of the town of Torre Pacheco with his village of Balsicas, which involves an investment of 266,324 euros.

This improvement focuses on a stretch of 6.4 kilometers between the intersection with MR-F26, which leads to Los Alcázares, and 6.4 kilometer, at the junction with the variant of Torre Pacheco, "which will be culminated before the end of this year. "

Resaltables the strengthening works are paving asphalt hot forming and lining ditches, building work to adapt and improve drainage and replacement of road markings and road markings.

Source: CARM

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información